EIA for Proposed Development of New Water Villas and Over Water Restaurant at Hudhuranfushi, North Male Atoll. |
|
Written by eia
Wednesday, 09 May 2012 05:03 |
|
|
|
|
|
EIA for Proposed Development of New Water Villas and Over Water Restaurant at Hudhuranfushi, North Male Atoll.
Non Technical Summary
This report discusses the findings of an environmental impact study undertaken by Water Solutions Pvt. Ltd. for the proposed development of over water structures and a staff quarter on land.
Hudhuranfushi is formed on the eastern rim of north Male’ Atoll sharing the reef with two other islands, one of which is the Atoll Capital, Thulusdhoo. In April 2012, the size of the island was measured as 18,4560 m2 or approximately 18hectares.
The proposed project consists of two major components, namely over water development and development on land. Over water development consists of constructing a new set of water villas and an over water restaurant while the development on the island includes construction of a staff quarter. Following are the major components of this development:
Download Report
|